SYNCHRO Modeler Ideas Portal

SYNCHRO+ Early Access Release notes (and Welcome!)

UPDATED January 21, 2026

SYNCHRO+ Early Access (01.00) released through Software Downloads on January 26, 2026

SYNCHRO+
SYNCHRO+ is the next evolution of SYNCHRO 4D Pro and SYNCHRO 4D Modeler. SYNCHRO+ unifies the powerful planning and estimating workflows of both products into a single, integrated solution. With a streamlined interface and AI-enhanced functionality, SYNCHRO+ simplifies model navigation and interaction, enhances team collaboration, and enables Users to navigate construction sequences and models with greater depth, ease, and speed.

Disclaimer

This release is part of an early development cycle of SYNCHRO+ and is provided for evaluation and testing only. It is not certified for production use, and the functionality, performance, and stability are subject to significant change. Do not use this version for any production work or deploy it in live project environments.

Access to SYNCHRO+ installer is strictly limited to participants of the SYNCHRO+ Early Access Program. If you did not receive this installer directly through the approved Early Access distribution process, you are not authorized to download, install, or use this software. Redistribution, forwarding, copying, or sharing of the installer, download links, or any related materials is strictly prohibited. Unauthorized distribution may violate program agreements and result in removal from the Early Access Program.

Feedback? https://splusea.ideas.aha.io/

SYNCHRO+ supports the following user workflows:

  1. Estimating and breakdown:

    1. Create, edit and merge Slices

    2. Work area creation and slice by work area

    3. Cost code, assign cost codes and properties

  2. Planning and 4D:

    1. Create a basic 4D model

      • Import a schedule (P6 XML or MSP XML)

      • Create appearance profiles (with custom growth)

      • Assign model elements to Tasks

      • Playback 4D

    2. Schedule review

      • Task search

      • Task filters and column filters (not all columns)

      • Gantt chart and navigation

      • Task properties

        • General Info

        • Review Task links (and trace logic)

      • Critical path

    3. Schedule change management

      • Synchronize schedule (P6 XML)

    4. Planning, scheduling and editing Tasks

      • View and edit Data Date

      • Create and delete Tasks*

      • Link Tasks*

      • Unlink Tasks in Task Properties - Links

      • Editing limited Task fields in the Task table:

        • Task editing is very limited and is a work in progress. You will need to use Column Manager to make those columns visible. Editing Tasks is NOT possible in the Task properties.

        • Id

        • Name

        • Planned Start, Planned Finish, Planned Duration

        • Actual Start & Actual Finish

        • Estimated Finish

        • Remaining & Actual Durations

        • Comments

      • Reschedule all Tasks*

Features and other things worth noting:

  • Opening iModel now shows more informed progress with steps.

  • The Plan frontstage introduces new playback and Gantt header experience.

  • P6 and MSP XML imports are now combined.

  • Feedback button enables users to submit feedback through Aha.

  • Day 0 experience is more calming. Widgets are relocated or hidden in both frontstages. Copilot is now disabled until further improvements are in place.

  • Work Area improvements with user outcome in mind:

    • Unassign unsliced elements from existing Work area

    • Selecting multiple work areas allows user to select all elements associated with those work areas

    • Alignment-based work areas now start at the station value from properties (no more 0) to provide more project context based on location

  • Cost Codes:

    • Cost codes are reassigned upon creation of slices.

  • Gantt table improvements:

    • Improved drag-and-drop functionality

    • Updated table UI

    • Lock ID and Name columns for easier navigation

    • Redesigned animation playback

  • Construction data changes can be auto-sync to iModel Hub including slices, work areas and cost code assignments. Changes will be automatically synced every 5 min or when closing iModel.

  • Construction data creation

  • iModel viewer and navigation including:

    • Models and categories trees

    • Visibility toggle and tree search

    • Element properties

    • Enable and disable Maps

    • View Saved Views, and create, rename and delete Saved Views

    • Section

Known issues

  • Import schedule only allows for small data set

  • All batch operations may experience slowness (linking two tasks, deleting multiple tasks and links, as an example)

  • Workflows with * marked are currently experiencing issues that the team is actively working on.

  • Task editing is very limited, and the editable Task columns can be made visible in the Task table using Column Manager. Editing Tasks is not possible in the Task properties.

    • ID

    • Name

    • Planned Start and Planned Finish

    • Actual Start and Actual Finish

    • Planned duration

    • Remaining duration

    • Actual duration

    • Comments

Download

  1. Download through Software Downloads

    1. For colleagues, please turn on the toggle for "Show Internal Products or Deliverables."

    2. SYNCHRO+ is in early development. Please do not use for Production and do NOT share the installer.

  • Jacqueline Chen
  • Nov 3 2025
  • Attach files